Process · One Project. One Process.

One project,
one flow

From initial requirements through design, content, production, inspection and on-site delivery. No stage stands alone; each follows one project standard.

A typical project runs from requirements to final light-up including an average 50-day production period, with timing depending on form and scale.

Workflow

From sketch to light-up,
one standard

Steps
6steps
From requirements to final light-up
Production
50days
Average production period
Pencil sketch of a lobby wall where an LED screen will goSketch · Lobby
  1. 01

    Requirements

  2. 02

    Form & structure design

  3. 03

    Content design

  4. 04

    Production

  5. 05

    Inspection & export

  6. 06

    Installation & support

Six Steps

How a project moves forward

A drawing, a site photo or just the form you have in mind is enough to start. The deliverables of each step become the standard for the next.

  1. 01
    Start with step 01
    Requirements

    Requirements

    Installation environment, viewing distance, ambient light and content type are confirmed. A drawing, a site photo or the form you have in mind is enough to start.

    • CheckedIndoor or outdoor, viewing distance, ambient light, operating hours
    • From youArchitectural drawings · site photos · reference images
    • DeliverableInitial proposal — form · pitch · expected configuration
  2. 02
    Form & Structure

    Form & structure design

    Starting from site survey and 3D review, curvature, split lines, frame exposure and finish details are matched to the architectural drawings. Distortion and brightness are reviewed per viewing angle and the pitch is fixed.

    • ScopeScreen form · cabinet layout · support structure
    • ReviewViewing-angle simulation along the main routes
    • DeliverablesCabinet layout · support structure · power and signal schematics · assembly drawings
  3. 03
    Content

    Content design

    Pixel maps and distortion-correction values are built from the real form and pixel structure of the screen. Screen-specific content is produced, or existing assets re-edited.

    • MappingForm-based pixel map · distortion-correction profile
    • ProductionIn-house · studio co-production · re-edited client assets
    • DeliverablesPlayback content · playback system configuration
  4. 04
    Production

    Production

    A manufacturing partner matched to the product line and technical requirements produces to Mimolux specifications and process standards. Assembly, process and calibration are checked during production.

    • MaterialsLED, power supply and receiving-card grades specified by Mimolux
    • ControlCabinet tolerances · module assembly · full-assembly inspection
    • Lead timeAverage 50 days (varies with form and scale)
  5. 05
    Inspection & Export

    Inspection & export

    The whole screen or its key sections are pre-assembled for light-up, 72-hour burn-in, calibration and full pixel inspection. Nothing ships without Mimolux approval.

    • InspectionMaterials · burn-in · calibration · pixels · packing
    • ExportExport crates · moisture protection · C/O · invoice · packing list
    • ShippingSea or air / FOB · CIF · DDP · spare parts shipped together
  6. 06
    Installation & Support

    Installation & support

    On-site installation or installation support, final light-up, operator training and remote support close the project. Measurements are recorded per project so re-orders are produced to the same standard.

    • On siteInstallation data · technical documents · installation support
    • HandoverFinal light-up · operator training · playback system handover
    • SupportRemote support · spare parts · project records kept
From Design to Reality.

Built on site,
exactly as designed

A display project is complete not when the product ships, but when the intended screen is realised on site.

Technicians pre-assembling and checking a curved LED screen at the factory
01 · Pre-assembly

Full pre-assembly

Assembled close to the installed state to check structure, fixings and picture quality.

Colour measurement in front of a screen showing a solid red test pattern
02 · System Validation

System validation

Light-up, calibration, pixel condition, signal and power configuration verified before shipment.

Installer fixing an LED cabinet frame from scaffolding on site
03 · Site Coordination

Site coordination

Design drawings and installation data matched to site conditions, with the technical documents the site needs.

Installer on an aerial work platform fitting LED cabinets to a building facade
04 · Installation

Installation

On-site installation or installation support.

Final light-up of a large LED wall in a lobby
05 · Commissioning

Light-up · handover

Final light-up, operator training and remote support close the project.

Start with Step 01

Your requirements
are enough to start

Start a project

Environment, viewing distance, the form you have in mind. Drawings or site photos make the proposal more precise.